EV Charger Estimating Services

EV charger estimates for electrical contractors, general contractors and fleet owners. We count every charger, transformer, panel, conduit run and bollard from your plans and deliver an editable Excel estimate, usually within 24 to 48 hours.

What You Get

Overview

What Is EV Charger Estimating

EV charger estimating is the process of pricing the chargers and everything needed to power them. It covers Level 2 and DC fast chargers, transformers, switchboards, panels, conduit, wire, trenching, boring, concrete pads, bollards, signage and striping.

Most of the cost is not the charger itself. Power upgrades, long underground conduit runs and site repair often cost more than the units. We take the electrical and site plans in PlanSwift and Bluebeam and list every item separately, so your bid covers the full installation.

EV charging station electrical estimate with transformers, switchboards, Level 2 and Level 3 chargers
What We Cover

EV Charging Scopes We Cover

Level 2 Chargers

Wall and pedestal mounted Level 2 chargers counted by port and location.

DC Fast Chargers

Level 3 fast chargers with their dedicated power equipment.

Power Distribution

Transformers, switchboards, panels and generator connection cabinets.

Conduit and Wire

Underground conduit, pull boxes and feeders measured by run.

Trenching and Boring

Saw cut, trenching, directional boring and pavement repair.

Bollards and Striping

Protective bollards, footings, EV signs and parking stripes.

Commercial EV charger installation estimate with conduit, boring, bollards and signage
Project Types

EV Projects We Estimate

From small projects to large buildings, as a standalone EV charger estimate or as part of a whole job estimate.

Fleet Depots

Delivery stations with large numbers of fleet chargers.

Office Buildings

Workplace charging in parking lots and garages.

Retail and Hotels

Public charging for customers and guests.

Multifamily

Resident charging for apartments and condos.

How It Works

Our EV Charger Estimating Process

01

Send your plans

Upload your drawings, specifications and bid date, or email them to us.

02

Get a fixed quote

We review the scope and reply with a price and delivery date.

03

We build the estimate

Our estimators complete the takeoff and pricing for your scope.

04

Receive and revise

Get your editable Excel estimate, with free revisions any time.

Deliverables

What You Receive

Why Us

Why Electrical Contractors Choose Us

FAQ

Frequently Asked Questions

The price depends on the size of the project and the scope you need. Send your plans and we reply with a fixed quote, usually the same day.

Most EV charger estimates are delivered within 24 to 48 hours. Large projects can take a little longer and we tell you upfront.

Send the electrical site plan, one line diagram, charger schedule and any civil or site details. PDF drawings are fine.

Yes. Transformers, switchboards, panels, feeders and conduit are counted along with the chargers.

Yes. Saw cutting, trenching, boring, pavement repair, bollards and striping are listed separately.

We use PlanSwift and Bluebeam for takeoffs and RSMeans data for pricing.

Yes. If the drawings change or you need an alternate, we update the estimate at no extra cost.

Get Started

Request a Free Quote

Upload your plans and we will reply with a fixed price and delivery date, usually the same day.

Phone
+1 718 305 4518

Email
info@usaestimation.com

Office
1942 Broadway St., Suite 314C
Boulder, CO 80302, USA

USA Estimation LLC

Construction estimating and quantity takeoff services for contractors, builders and developers across the United States and Canada.

Contact

1942 Broadway St., Suite 314C
Boulder, CO 80302, USA
+1 718 305 4518
info@usaestimation.com

© 2026 USA Estimation LLC. All rights reserved.